FedEx Automation Hub

Client

NorthPoint Development

Location

Fairless Hills, Pennsylvania

Project Details

FedEx Automation Hub

Industries

  • Industrial & Manufacturing

Build Types

  • New Build

Size

1,200,000 SF

Key Statistics

164.26 Acre Cross-Dock Distribution Hub and Automation Facility

8” Thick Fiber-Reinforced Floor Slab with Ashford Densifier

Entire Slab Protected by a Fully Engineered Vented Vapor Barrier

Fiber and Steel Reinforced Concrete Tilt-Up Wall Panels

273 Dock Positions with Shelters, Canopies, Hydraulic Levelers and Restraints, Block Heaters, Trailer Lights, and Trailer Fans

Four 60’ Wide High-Speed Bays with 20’ Wide x 3’ Deep Structural Reinforced Conveyor Footings

±900 Trailer, 290 Tractor, and 138 Van Parking Spaces

±1,005 Employee Parking Spaces, including 24 ADA Spaces

Security Fencing Around Truck/Trailer Parking with Gate Access

FM ESFR Fire Protection with Exterior Underground Loop Fed From On-site Electric Fire Pump

Heated and Ventilated Warehouse with HVLS Fans for Circulation

± 45,000 SF Combined Tenant Specific Office Spaces

Security Access Entrance with Turnstiles and Ballistic Paneling

Salt Storage Building

±10,000 SF Separate Vehicle Maintenance Garage Including:

Six, 14’x16’ Drive in Doors

Radiant Heat within Drive-In Bay

Three (3) Offices and Storage Mezzanine

Two(2) ADA Compliant Restrooms

Related Projects

  • Keystone Trade Center Building 3

    Fairless Hills, PA

  • Northland Park 8

    Kansas City, KS

  • Marvin Windows

    Kansas City, KS